From:                              route@monster.com

Sent:                               Friday, April 15, 2016 10:22 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: CS UT

 

This resume has been forwarded to you at the request of Monster User xapeix03

Steven Paulsen 

Last updated:  02/26/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Dearborn Heights, MI  48125
US

Mobile:   
Home:

spaulsen@prodigy.net

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Steven Paulsen Resume

Resume Value: g8cactnsq9edkgbp   

  

 

Page 1                                                          Steven B. Paulsen

          4637 Clippert St.

Dearborn Heights, Mi.  48125

                 Home (313) 278-3519 Cell (313) 510-0537 spaulsen@prodigy.net

 

Nov 2011 to              Sigma Network Services, Cincinnati Bell, Cincinnati, Ohio

Present                            Fielded and completed Fiber to the Home (FTTH) construction prints for aerial and buried applications.  CenturyLink pole line work from             

July 2012 to December 2012, completing overdue joint use applications.  Worked AT&T projects.

 

Sept 2010 to              ADEX Corp, ATT, Memphis, Tennessee

Oct 2011                            Worked copper DS1 projects in the Design Provisioning Center utilizing OPEDS / BSTCAD, completed PMTOOL and Wide Band testing.

 

Apr 2010 to              Mountain LTD,  ATT, Kansas City, Missouri

Aug 2010              Worked from home completing F2 pair bonding on projects using the DCP and FEI modules in the Engineering Portal for ATT’s project Light Speed. Project managed approximately 10 engineers with projects flowing through me for Quality Control on 80 projects.

 

Feb 2008 to              Butler Telecom, RRT / ATT, Detroit, Michigan

June 2009              Planning completed in the Resource Recycling Technology database for the removal of ATT copper trunk lines.  Transferred to RRT operations in September 2008 as project / program manager.

 

April 2005 to              Butler Telecom, SBC / ATT, Livonia, Michigan

Nov 2007              Prepared work order packages in design for FTTN U-verse (Lite Speed), tracking jobs and trouble-shooting all jobs / revisions with construction including problems with AOTL, R/W & easement placements, conduit, cable, splicing and electrical.  Was requested by planning periodically for help with fiber routing, costing and design.  Worked units starting in August 2006 for Butler and PowerTel Inc. placing VRAD’s and F2 conditioning in the Detroit and Chicago metro areas.  Completed between 3 – 5 VRAD placements / week and 3 – 5 F2 conditioning jobs per week.   Worked with drafting in Micro station (ARES).

 

Oct 2004 to              Tesinc, SBC, Houston, Texas

April 2005              Worked from home completing Distribution analysis and rehab planning packages.  Used OPTI-LITE CAD.

              Completed Distribution analysis packages based on information from ATT LEIS–LAD (loop activity data) output.

 

Sept 2003 to              GXT, Inc., SBC, McAlester, Oklahoma, WorldCom, Detroit, Michigan

Oct 2004              Single contract engineer in remote engineering office.  Managed all engineering for nine rural wire centers.  Managed other contract engineers through ACAS projects.  Major projects were NGDPG, engineered and coordinated Civic projects (City and County road relocations), service to Cellular Towers including inspection, held orders (F1, F2, T1, T3).  Presented project proposals to planning for F1 relief.  Inspector for MCI in Detroit for highway relocation / rebuild project (Highway 12 – Michigan Ave).

 

July 2001 to              CDI Communications, Ameritech, Detroit, Michigan

Oct 2001              Project Engineer for Infrastructure Maintenance Organization.  Supervised work load for 14 engineers.  Worked with drafting in Micro station (ARES).

 

March 2001              OSP Consultants, Richardson, Texas

to July 2001              Regional Manager for OSP Cellular operations, Texas consisted of walk through, routing and pricing for antennas at various buildings in Houston, Texas.

 

Jan 2000 to              Southwestern Bell Telephone, Austin, Texas

March 2001              Contracted Jan to April, hired on as Manager Engineering Design - Managed all engineering, outsource and in-house, for the Fireside wire center.  Approved CLEC applications and designed diverse routing for fiber DS3 circuits.  Worked with and supervised seven contractors and helped train new SWB engineering employees. AutoCAD 2000/4CEF OPTICAD. Managed / Engineered for Broadband (PRONTO) projects.

 

June 1999 to              ComPlus, IXC / Broadwing Communications, Austin, TX

Jan 2000              Senior Project Fiber Designer - Supervised Engineering Companies and completed working drawings for conduit entrance / diversity routes within the United States. Coordinated and engineered 14 route miles of underground with Bell South in Miami, FL. CAD 14.

 

July 1997 to              Universal Network Development Corp., Southwestern Bell, Dallas, TX

June 1999              Project Engineer/Manager - Worked numerous large projects including pair allocations for ADSL (36 SAI’s), managing four engineers and two drafters.  Start up for SW Bell 4CEF (OPTI) system included setup and training.  Also included permitting to TXDOT for Caprock Communications.  AutoCAD 14, OPTI-LITE.

 

April 1997 to              Henkels & McCoy, GTE, Gardnerville, Nevada

July 1997              Engineered and submitted work prints in Micro station IDDS (ICGS) for placement of pair gain units (copper fed UMDC) and feeder relief in rural farming areas of Nevada.  Completed nine projects.

 

March 1994 to              North Star Telecom Services, Nevada Bell, Reno, Nevada

April 1997              Facilities Planner, Lead Area Engineer, Project Engineer- Complete Route planning for the Reno South & Metro areas. Analyzed wire center distribution areas for high cost maintenance utilizing LAD database.  Managed four engineers completing Fiber fed Lite-Span, SLC96 & Series 5 - copper and fiber fed based on Bell PLAN programs. Handled all ISDN, HI-CAP and DS3 requests. AutoCAD 11 & AutoCAD 12.

 

March 1993 to              Professional Assistance Inc. / A.T. & T., GTE, Honolulu, Hawaii

March 1994              Project Engineer / Distribution Planning Manager - Detailed work orders and projects in Micro station IDDS (ICGS) on the island of Oahu for Hawaiian Telephone.  Promoted in August to Planning Manager representing A.T. & T. for the State of Hawaii. Managed five engineers and coordinated off site work with a sub-contractor in California for Long Range Planning packages.

 

 

 

 

 

Page 2                                                       Steven B. Paulsen

 

Oct 1989 to              Butler Telecommunications Services, Pacific Telephone, Ukiah, California

Feb 1993              Facilities Planner / Senior Engineer - Presented estimate proposals and detailed Feeder Administration Packages for complete route relief in rural and suburban areas of northern California.  Planned and designed Rule 20 highway relocation projects. In UNIX, utilized and trained company managers in the use of LEIS / LEAD, PLAN, ESM, DILEP and LAD - Bell Telephone computer programs.  Left for required six-month separation from P.T.&T.

 

Oct 1983 to              Various locations in the New England area for NYNEX and SNET             

Oct 1989              Butler Telecom, Springfield Mass. 9/88 to 10/89.  Senior Project Engineer-Held orders, HI-CAP services through existing

                            projects - worked on line with splicers and the Mechanized Line Assignment Center.  Engineered T1 routing for first cell tower in Springfield, Mass. and completed walk through with  vendor for equipment location and routing through to hospital roof.

- CDI Interglobal, New London, CT., 6/87 to 9/88. Senior Project Engineer

Submitted and engineered planning packages for copper digital relief estimates, including SLC Series 5, integration and mainframe terminations for unigauge office conversions.  Exchange fiber fed SLC included ordering, equipping and installation instruction for 80D cabinets and Controlled Environmental Vaults.

- Butler Telecom, Worcester, Mass. 4/85 to 1/87.  Project Engineer

              Completed routine orders for Distribution Services Engineering, organized new pole lines and rebuilds with all various utilities. Worked with Line Assigners to complete held orders and with the installation of analog pair gain (S6B and CM8). 

- Tesinc, Boston, Massachusetts 10/83 to 4/85. Long Range Planning Engineer

              Coordinated the completion of seven Long Range Planning Binders in the Boston Metro area. Utilized EFRAP,

              LFAS and CARL - Bell computer programs.  Supervised five support personnel

 

June 1983 to              Thomas Technical, General Telephone, Santa Monica, California

Oct 1983              CATV Engineer / Construction Inspector

 

Jan 1982 to              International Communications Services, Mountain Bell, Billings, Montana

Dec 1982              L.R.O.P.P Engineer - Detailed planning binders, Administration Route Layouts, Distribution Analysis Charts.

 

March 1981 to              Butler Telecommunications Services, Pacific Telephone, Los Angeles, California

Jan 1982              Planning Binders for five central offices were completed.  Involved in presentation to Los Angeles Staff, Harbor Engineering.

 

May 1980 to              K & B Engineering, Pacific Telephone, Bakersfield & Santa Ana, California

March 1981              Completed L.R.O.P.P and D.A.D.R. for route two in the Bakersfield Main Exchange.  Transferred 10/80, supervised six fielders and

              completed detailed drawings for California State Highways, P.T.&T., Edison Electric, City of Anaheim and Storer Cable Systems.

 

June 1978 to              Burnup & Sims, Volt Technical, Pomona, Riverside and San Bernardino, California

May 1980              Senior Draftsman, Field Engineer - drafted records and technical prints including scaled drawings for conduit placement permits for Pacific Telephone and General Telephone.

 

EDUCATION

 

Apple Valley Senior High, Apple Valley, California

September 1974 to June 1978

Major: Mechanical / Architectural Drafting

Minor: Electronics

Courses: Geometry, Algebra and Electronics

Mechanical Drafting - 2 years / Architectural Drafting - 3 years

Bakersfield Community College: one semester - English, Psychology

Amateur Radio License - 1969 to 1973 Call letters WN6IRO

              Computer Assisted Drafting - AutoCAD 11 through 2002, SBC OPTI-LITE, GTE ICGS (Micro station), BSTCAD

              Familiar with Microsoft Office, Word and Excel

 



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-MI-Detroit

Relocate:

Yes

Willingness to travel:

Up to 50% travel